BACK TO NEW BRIDGE PROJECTS

US 62 over Black River

Client: Souder Miller 

Owner: NMDOT

Project Location: Carlsbad, NM

Design Completion Date: 04/2006

Estimated Cost: -


Project Details:

  • New two-lane bridge built adjacent to existing bridge.

  • Six 84’ spans with an overall bridge length of nearly 510’.

  • AASHTO Bulb-T girders

  • Semi-integral abutments
  • Drilled shaft foundation
  • Continuous for HL-93 live loading.
DSC_0039.JPG