US 62 over Black River
Client: Souder Miller
Owner: NMDOT
Project Location: Carlsbad, NM
Design Completion Date: 04/2006
Estimated Cost: -
Project Details:
New two-lane bridge built adjacent to existing bridge.
Six 84’ spans with an overall bridge length of nearly 510’.
AASHTO Bulb-T girders
- Semi-integral abutments
- Drilled shaft foundation
- Continuous for HL-93 live loading.