inn of the mountain gods travel center bridge
Client: Molzen-Corbin & Associates
Owner: NMDOT
Project Location: Ruidoso, NM
Design Completion Date: 11/2002
Project Details:
Concrete slab bridge over drainage channel from parking area of Travel Center to US 70.
Single span bridge; span length of 46’-0”.
Continuous for HS-20 live loading.
Curved bridge deck varying in width from 64’-0” wide to 94’-9” to accommodate turning lanes.
Shallow spread footing foundation.