San Jose Blvd. Bridge

Client: Souder Miller & Associates

Owner: City of Carlsbad

Project Location: Carlsbad, NM

Design Completion Date: 08/2014


San Jose Phase III-bridge 3-5-15 137.JPG

Project Description:

  • Single span slab bridge over the Carlsbad Irrigation District crossing, south of Harper Street. 
  • Bridge length of 36'-0", width of 69'-0", and slab thickness of 22".
  • The bridge accommodates (2) 11'-6" driving lanes, (1) 13'-0" turning lane, (2) 9'-6" shoulders, and (2) 5'-6" sidewalks. 
  • Designed for live load design truck HL-93
sanjose.jpg