BACK TO NEW BRIDGE PROJECTS

Pavilion interchange (Jaguar bridge) over NM 599

Client: Santa Fe Engineering Consultants 

Project Location: Santa Fe, NM

Design Completion Date: 01/2014


Project Description:

Bridge Construction in Progress

  • Two span continuous prestressed concrete girder bridge. 
  • Total length of 170'-0" and width of 59'-0" (designed for future widening of 81'-0")
  • Accommodates (2) 11'-0" driving lanes, (1) 14'-0" median and turn lane, (2) 5'-0" bike lanes, and (2) 5'-0" sidewalks. 
  • Shallow spread footing abutment foundations supported by mechanically stabilized backfill and MSE walls