NM 228 Interchange (Mesquite)

Client: Molzen-Corbin & Associates

Owner: NMDOT

Project Location: Las Cruces, NM

Design Completion Date: 03/2010

Estimated Cost: $3,686,196


DSCN5644.JPG

Project Description:

QPEC was a subconsultant for the conceptual, preliminary, and final design and construction services of the Mesquite Interchange on I-10. The project required a full replacement of the existing interchange bridge. After analyzing several different options for the new bridge, a two span prestressed concrete bridge proved as the most economical choice for final design. The bridge construction completion date was in January 2015.