BACK TO REHAB BRIDGE PROJECTS

I-40 over 2nd street, 3rd street, and gamerco spur railroad

Client: NMDOT

Owner: NMDOT

Project Location: Gallup, NM

Design Completion Date: 04/2006


IMGP2407.JPG

Project Details:

  • Six bridge rehabilitations at three different sites

  • Each approximately 65’ single span bridge

  • Rehabilitation design to:

    • replace bridge deck and barrier railings,

    • repair concrete at abutment seats and wingwalls,

    • construct new approach slabs,

    • replace bearings and joints.

  • Steel girders at Gamerco Spur
  • AASHTO precast girders at 2nd and 3rd Streets

  • HS-20 live loading.