i-25/US 285 Interchange

Client: NMDOT

Owner: NMDOT

Project Location: Lamy, NM

Design Completion Date: 10/2000

deming-3.png

Hackberry-3.png

Project Details:

  • Two existing prestressed concrete girder bridges with concrete abutments on HP piles and pier caps on columns and spread footings.

  • Rehabilitation design:

    • replaced bridge deck and barrier railings.

    • replaced/repaired concrete at abutment diaphragms, pier caps and wingwalls.

    • constructed new approach slabs.

    • replaced existing bearings.

    • reused 24 existing girders and replaced 16 girders due to poor condition.

    • provided new bridge joint seals at abutments.

    • installed new deck drains.

  • Four spans of variable length; 47’-10” to 82’-10” for an overall bridge length of 273’.

  • Continuous for HS-20 live loading.

  • Bridge width of 45’ for two lanes of traffic, each bridge.