BACK TO NEW BRIDGE PROJECTS

Rio Grande Bridge at fort selden

Client: NMDOT

Owner: NMDOT

Project Location: Fort Selden, NM

Design Completion Date: 06/2002


Fort Selden Bridge over Rio Grande 018.jpg

Project Details:

  • Preliminary and final design.

  • Built along side existing bridge, which remained in service for pedestrian uses.

  • Five span precast girder bridge, each span 100’ long.

  • Total bridge length of 503 ft.

  • Continuous for HS-25 live loading.

  • Bridge width of 34’-6” for two lanes of traffic.

  • Treated timber and HP pile retaining walls between the two bridges.

Fort Selden Bridge over Rio Grande 010.jpg