Dona Ana Interchange

Client: Molzen-Corbin & Associates

Owner: NMDOT

Project Location: Las Cruces, NM

Design Completion Date: 05/2005

Estimated Cost: -


Project Details:

  • Two identical prestressed girder bridges along I-25 over NM 320.

  • Traffic used to travel through two existing CBCs.

  • Vertical and horizontal clearances of the CBCs are inadequate by current AASHTO standards.

  • Several alternatives considered which investigated cost effectiveness of various girder types, span lengths, and wall systems.

  • Proposed single span bridges, each 43’ wide and span 112’-6”.

  • Continuous for HS 25 live loading.

  • Spread footing foundation integral with tall cast-in-place abutment and wingwalls.